SeaPORT Logistics Center is a Class A Industrial Park located in the industrial center of Sumner, WA. The park is 130+ acres that will consist of up to 2.4 million SF of the warehouse at full buildout. Building 2 is a 268,000 SF Distribution Warehouse.

Details

Completed: Q4 2020

Phase III of 2.4 million SF assemblage

268,000 SF of Class A industrial warehouse space, single loaded building

Concrete tilt-up construction,  with a 7" fully reinforced slab

36' clear height, ESFR sprinkler system, 20 FC LED lighting, skylights, 290' building depth, 60' Speed Bay , 60'x56' column spacing, 38 grade level doors, (4) 12' x 16' at-grade, large power capacity

174 auto parking stalls, 54 trailer parking stalls (more parking available upon request), 130' minimum truck court depth

Signalized access to Stewart Rd, street frontage landscape concept that adds unique interface with the public right of way, 50'+ wide onsite access drives (fully lit), a pedestrian circulation that ties into the Sumner Link Trail system

Map